Reduce change orders. Minimize field conflicts. Protect your schedule and budget.
Four ways we reduce risk and keep projects moving — from precon to active construction.
Verify existing conditions before demolition so your scope is real — not assumptions.
Point cloud to Revit models and as-built drawings ready for coordination and field use.
Clash-ready models + support for coordination meetings and faster RFI resolution.
Periodic drone + targeted laser scans to document progress, detect variance early, and support pay apps & changes.
RCP / E57 — organized and ready for your team.
LOD 200–400 (scope-dependent) for coordination.
PDF / DWG for field and permitting use.
Upload-ready structure for smooth collaboration.
Two workflows: (A) existing conditions for precon/demo, and (B) periodic verification during construction.
Pick the cadence that matches project risk. We can focus scanning on high-risk zones (MEP rooms, ceiling corridors, risers, structural interfaces).
Yes. We can schedule around trades and focus scanning on specific areas to minimize disruption.
Address/city, approx. SF/floors, project type, and the deliverable needed (point cloud, BIM, drawings, progress program).
Periodic drone documentation + targeted laser scans on high-risk zones, plus a PDF progress report and ACC-ready uploads.
Typical deliverables are 3–7 days depending on scope, size, and required LOD/drawings.
Get a quote in 24–48 hours or book a quick 15-minute kickoff call.